CIVIL 
KEY PROJECTS

Homebush Shoring, NSW

Temporary shoring and permanent reinforced structure to

support a 10m deep basement excavation for a residential

apartment development.

Natrio Asia Pacific Ground Improvement Piling, SA

Installation of almost 1,000 ‘Controlled Stiffness Column’ piles to improve reclamation land at the Port Adelaide site and cater for heavy bulk product storage loading on fill sub-grade.

Carleon Estate Residential Subdivision, NSW

Stages 1, 2 & 3 of the subdivision, including roads, stormwater, sewer and water supply along with Master planning of a further 2,000 future allotments.

 

Broadview Estate Residential Subdivision, NSW

68 half-acre allotment subdivision which included 1.6km of leading sewer and water supply along with roads, sewer, storm water drainage and water supply for the subdivision.

Rookwood Cemetery, NSW

$20M of infrastructure upgrades to the oldest and largest working cemetery in Australia, including road and services networks, stormwater systems, traffic management and operational buildings such as a soil recycling facility and ‘Reflections Village’.

Barossa Chocolate Factory Dam, SA

Upgrade of the existing 8.5ML dam to create a water feature for the new facility, including dividing internal wall, detention storage, overflow structure with drainage and integration with building columns and footings.

Goulburn River Rehabilitation, NSW

Rehabilitation of eroded banks of the Goulburn River through the Ulan coal mine, including a 2.6km diversion drain, 3km of rock revetment with 45,000 tonnes of basalt rock, and over 30,000sqm of batter revegetation.

 Carleon Estate Residential Subdivision, NSW

​  Barossa Chocolate Factory Dam, SA

Rookwood Cemetery, NSW

"Cannot comment high enough on the service Triaxial delivered and would not hesitate to recommend to other organisations."

 

Rookwood

WHAT OUR CLIENTS SAY...

New road within Kemps Creek Cemetery, NSW

Rookwood Cemetery, NSW

Homebush Shoring, NSW

 Carleon Estate Residential Subdivision, NSW

Goulburn River Rehabilitation, NSW

Flood Modelling, NSW

BEFORE

AFTER